Hinged doors and drawers
Add a door to the correct opening
Door placement depends on the opening, supporting panels and mounting method. Confirm the opening before choosing one or two doors and the hinge side.
- Select the opening, add doors and choose overlay or inset mounting.
- Check gaps, edge overlays, hinge side and door dimensions.
- Preview opening and check shelves, drawers, adjacent fronts and walls for interference.
If placement fails, check supports and the selected opening. Increasing the door size repeatedly will not fix missing support.
Check the drawer box and slides together
The front, box and slides all require space. A front that fits does not prove there is enough box depth or fitting clearance.
- Add drawers to the selected space and set the count, front heights and gaps.
- Choose slides and check their length, side clearances, box depth and bottom construction.
- Open the drawers and inspect interference with the back, doors and handles.
If doors and drawers compete for the same space, change the compartment or remove the conflicting part before adding another.
Recheck movement after resizing
Changing the cabinet, shelves or fronts can change opening clearances. Review appearance and machining data after the final edit.
- Check the meeting gap between paired doors, top/bottom gaps and spacing between drawer fronts.
- Check the top panel position relative to the doors, especially when it extends over them.
- Confirm opening movement, regenerate drilling and export the final machining files.
Opening previews help reveal interference; they do not replace fitting installation requirements or on-site clearance measurements.